From: route@monster.com
Sent: Thursday, January 28, 2016 5:15 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
___________________________TIEN LAM______________________
tienlam408@yahoo.com
2333 Fortuna Lane, Tracy Ca. 95377 408-380-9549 OBJECTIVES: Seeking a position as a Lead or
Foreman for the Telecommunications field that will allow me to continuously
work and contribute my knowledge and experience to the company. In addition,
I would also like to contribute to the growth and development of the company. CERTIFICATIONS/TRAINING: BICSI Level I Certifications 2005 HILTI Rig Coring Certifications
2006 OSHA Rules, Procedures and Safety
2005 Asbestos Awareness Training 2004
& 2007 3M and HILTI Fire stop
Certifications Systems 2005 & 2006 Training Procedure (TP76300) SBC
and AT&T Safety & Quality Installations, 2002 & 2005 EDUCATION: High School Diploma/GED- San Jose
California 1996 San Jose City College – General
Studies 1998 SKILLS AND COMPETENCIES: • Highly conscientious in
planning, follow-through, and organization of projects. • Dependable team player with
successful track record as team leader. • Friendly personality; relate
well and work cooperatively with diverse personalities. • Excellent leadership abilities,
and communication skills. • Ability to research complex
problems; define core issues and outcomes. • Troubleshoot, repair, test, and
maintenance of Voice/Video/Data communication systems. Inside and outside
wiring, handling special projects as well as difficult or time-consuming installations,
where technical skills, customer relations and problem-solving ability are
very important to maximize the impact and strengths of the company.
Communicating, and Records-Keeping. I am very Methodical, and Pay Great
Attention to Detail, while being Goal-Oriented and Safe. • Computer skill, Microsoft Word,
Excel, Windows, Internet research. • Trilingual of Vietnamese,
Cambodian and English fluent, and able to travel. TNT Auto Body and Performance
– San Jose, CA. 2008-present Technician Collision repairs in all service
areas including: bodywork, chassis repair, painting, welding, mechanical and
final assembly. Filled in for other staff on a needed basis in order to
maintain seamless workflow, meet time sensitive deadlines and ensure the
highest level of customer satisfaction at times. My responsibility includes:
installing automobile car alarm, stereo, TV and customize speaker box, test
and repair. PNS-PACIFIC NETWORK SERVICES
–CH2M-HILL- 2006-2008 Foreman San Francisco State University-
Infrastructure Cabling Upgrade (Project) Provided supervision, guidance
& work assignments to 5 Leads crewmembers of over 30 technicians.
Analysis of job specifications or drawing problems, in process & final
quality inspections. Communicated effectively with engineers to resolve
network design errors. Consistently met project deadlines, ensured superior
quality and maintained high customer satisfaction.
Communicated with various teams on project status and issue resolution.
Driving quality and cost management. Foster team environment to improve
productivity and generated employee enthusiasm. Performed effective
troubleshooting, repair, and engineering inaccuracies. As general management
team; my responsibility duty included: coordinating and meeting with Architectural,
Mechanical and Electrical subcontractors for scopes of works. My responsibility also included
built out Telecommunications Rooms (TR), cable rack, conduit sleeves, wire
mold, j-hood, deed ring for cable pathway. Running 5k feet of 200 strands
single & multimode outside plant (OSP), 25k feet of inside plant (
ISP) optical fiber cable, included 500k feet of Cat6 and 20k feet of RG6
cable. Terminated and tested over 2,500 outlets location throughout school
campus of 11 buildings and turn in hard and soft copy of all test result.
Installation, Termination and Cortication of: Hubbell, Krone, Leviton, AMP,
Telecomm, MOD- TAP, Ortronics, Siemen, Wire-Mold, Panduit, Berk-tek, ADC,
ATT, Belden, Lucent, CNC, ICS, ICC, ATP, Tyco , products. Tested with
Volt/OHM meters, PENTA Scanners, Side Kick tester and FLUKE 1800. My responsibility included take
over 3000 pictures of school engineering inaccuracies and doing photo
annotation for revise actual field drawing. Barrow Alaska -Water Waste
(short term project) My responsibility included
overseeing subcontractors of Mechanical and electrical work in Water Waste in
the facility of city Barrow Alaska. My duty also working with subcontractors
to make sure all work according to engineer drawing and taking photo of any
work inaccuracies. Portland Oregon - Intel’s
Clean Room (short term project) My responsibility is working and
coordinating with subcontractors in the Clean Room (CR) for installing and
removing robot equipment. My responsibility duty included held daily and
weekly meeting and complete daily activity report for the customers. E3-SYSTEMS – Union City, CA.
2003-2006 Level III-Lead Central Office Environment
Installations, (M.O.P) Method of Procedure documentation, (RFI) Request for
Information, walk job and site survey with client/engineer and project
manager before (JSA) Job Start Agreement (Reading and understanding drawing,
blueprint, schematic and scope of works for the projects. My responsibility
included, built out Telecommunications Room (TR), MDF, IDF and HUT, also
installing Alcatel 7670, ADSL, ADSL Copper Max, DSLAM, Nortel, Siemens, Cisco
ONS 15454, Lucent DMX, Motorola, NEC, Marconi, ADC and Scientific Atlanta. Other responsibility duties
included, general cable routing, grounding, mount bays, rack loading, sewing,
wire wrapping, lacing, dressing, labeling, stitching, lugging, tapping,
crimping, bonding / fire stopping. Auxiliary bracing of high and low framing,
BDFB cabinet and fuse panels. Running, terminations and testing of 66/110
block, face-plate and patch panels, DS1/DS3, RG6, RJ45, Cat6/Cat7, copper,
fiber optic, switchboard and power cable, using power meter, LAN Tester,
T-Birds310, Fluke 1800, Algilent and OTDR. Installed battery spill protection
guards and rectifier at cell sites, Data Center, Head End and also in Central
Office of SBC and AT&T facility. Oversaw and provided work
assignments to Level 1 and 2 installers activity for installing RPD, NSG,
DSX3, fiber optic panel for Voice, DATA and Video for Comcast Head End
Facility in the Bay Area. This also includes overseeing projects in in
commercial building, hospital, school, and government facility for installing
MDF, IDF, wireless antenna, j-hook, hanger, run, terminated, polish
optical fiber, test voice, data and video cable. Interface with Job
Supervisors and Engineers to resolve any order
issues. Correct on site job specifications, drawings, documentation, QA/QC. ADC Telecommunications -Sacramento,
CA.
2001-2003 Level-III Tech Responsibilities included,
installed iron work/frame/bays/equipment rack, aux bar, cable rack, wire
managers, fiber raceway and fiber duct, cabinets and equipment within. Experience with the installation
of Optical Carrier equipment: Lucent 5ESS, Nortel DMS10, Nortel, Siemens,
Cisco ONS 15454, Fujitsu, Alcatel, Lucent DMX, Motorola, Tellabs,
Juniper, NEC, Marconi, ADC, Conklin, GoDigital, Scientific Atlanta and ADSL
Copper Max. Lacing, sewing, labeling and test power, fiber and copper
cabling, includes h-taps, inline splicing, cutting, grinding,
grounding, bonding, bus bar and termination to BDFB. Running and testing
copper cabling includes DS1/DS3, DSX3 BNC connectors, Cat3/Cat5, fiber optic,
and wire wrapping. Fiber cabling includes video scoping and light level
testing using EX-FO. Cable runs included closing of cable holes with Hilti
and 3M systems standards. My skill included; Interpret, layout blue print and
analysis job Method of Procedures (MOP) equipment and wiring documentation
equipment in Central Office of SBC & AT&T facilities. Telpro Technologies – Benicia,
CA.
1999-2001 Level-II Tech Responsibility duties included,
installing of ironwork, ladder rack, fiber raceway, mount and line up bays.
Installing Alcatel ADSL, Lucent, Litespan2000, Cisco OC-12, OC-48, Nortel,
Titan, BDFB, fuse panel, running and testing optical fiber, coax RG6, RJ45,
fiber jumper, patch cord, Cat3/Cat5, DS1/DS3, switchboard 25, 50, 75 &100
pairs and power cable. Connected power cable lugs, grounding, BNC connectors,
wire wrapping testing DS1/DS3, Fiber and power continuity, lacing, sewing,
dressing, labeling cable, inventory, reading engineering blue print,
specifications, documents and learning TP76300 Specs of SBC and AT&T
Safety and Regulations. References Provided upon Request |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|